Custom Designed Websites

This is a frequently asked question by founders looking to build a custom website. Because it is difficult to standardize a website into a single, simple definition, this topic is fraught with ambiguity and contradictory answers. Do you mean an online magazine like Entrepreneur.com, an e-commerce website like Amazon that allows people to buy items online, or social media websites like Twitter or Facebook, or any of the numerous other options?

A custom website will take at least 14 weeks to complete. The three most important factors to consider when answering this question are as follows:

  • How does a developer go about creating a website?
  • How quickly can you provide feedback to the developer after he or she sends you something to review?
  • How quickly can you create all of the content for Custom Designed Websites?

What Is The Website Development Process?

Each developer has their own process for moving from the idea stage to the finished product, but it is usually similar in structure to other developers’ processes. For example, when creating Custom Designed Websites, the procedure is as follows.

Conceptualization: Every project starts with an idea, but you haven’t worked out all of the details of yours yet. As a result, spending a week researching the industry and thoroughly understanding the problem you’re attempting to solve is a good idea.

Wireframes: Using online tools like Balsamiq, the concept is then translated into simple wireframes. The developer is attempting to design how each page should look from a macro perspective. You’re only concerned with the big picture: which pages are important, what kind of content goes on these pages, and how each page flows into the next.

Changes and feedback: At this point, you give the developer feedback on the changes you want to see made to the wireframe. Because the wireframe is created in Balsamiq, revisions are simple.

Design: After completing the wireframes, you will create live mockups in this stage using HTML, CSS, and JS. It’s worth noting that none of these live pages are required to be linked at the moment.

Feedback and Changes: During this review, you can suggest changes to the design stage. The mockups will be updated until you are happy with the overall look and feel of the pages.

Development: After completing the design stage and all revisions, the developer begins backend development work. This cannot be done concurrently because the backend work is dictated by the front end requirements. This is usually the most time-consuming and lengthy stage of the project.

Feedback and Changes: At this stage, you will test the Custom Designed Websites in live production mode and make any necessary changes until you are satisfied with the final version of the Custom Build Website.

Launch: The developer adds analytics for tracking, sitemaps, and publishes your project on the day of the launch.

How Quickly Can You Provide Feedback To The Developer After He Or She Sends You Something To Review?

The time it takes to provide timely feedback causes most projects to be delayed. The process outline depicts three distinct ‘Feedback and Changes’ stages. In order for the project to be completed on time, you must ensure that you are providing effective feedback to your developer. It is critical that you summarise your thoughts and respond to the developer as soon as possible. Most developers will give you between 24-48 hours to review and provide feedback on their work.

How Quickly Can You Create All Of The Content For The Custom Designed Website?

A delay in gathering content for the website is the most common cause of projects missing deadlines and taking a long time to complete. For example, if the Custom Website Design has a FAQ page, the most important factor in the page going live is submitting the FAQ page’s questions and answers. If you want images on the website, make sure you have them ready before the developer. Having all of your content ready ensures that your website goes live on time.

Conclusion: The time it takes to build a Custom Websites is heavily influenced by the type of website you want to build and the features you want the Custom Designed Websites to have. It usually takes at least 14 weeks to complete a project: one week for the idea, two weeks for the wireframe, three weeks for design, four weeks for development, and four weeks for feedback and changes.

 